Every incident in Movable Ink's own record, newest first, with each update the provider posted. Durations are the provider's, from when it logged the incident to when it marked it resolved.
· lasted under a minute
Affected: Web App
resolved ·
Earlier today, some users experienced login issues affecting the DaVinci platform not allowing them to enter the platform. Our Engineering team has confirmed that services are now operating normally. We apologize for any disruption this may have caused. The issue have been resolved and users should now be able to log in to their accounts as normal. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be published in 7 business days.
· lasted under a minute
Affected: Web App
resolved ·
Earlier today, some Da Vinci users encountered intermittent errors while working in the platform, and certain functions were temporarily unavailable. Our Engineering team has confirmed that services are now operating normally. We apologize for any inconvenience this may have caused. Please reach out to the Technical Support team if you continue to see any issue or have additional questions. A post-mortem will be posted within 7 business days.
· lasted 1h 39m
Affected: Content Rendering
postmortem ·
Postmortem Incident Summary On October 21, 2026, between 15:53 UTC and 18:20 UTC \(11:53 AM to 2:20 PM ET\), Capturama had trouble retrieving external images and assets while rendering content. The disruption reached our regions one after another, and each region recovered as we reversed the change. During this period, images pulled from customer-hosted assets may have failed to load in content rendered by Capturama. The issue started with a routine update to the service that retrieves and caches external images. The update included a security patch that turned out to be incompatible with another software component the service depends on. That caused image requests to fail. Our standard health checks kept passing because they didn’t test image retrieval, so the problem wasn’t flagged automatically. Customer reports brought it to our engineering team. Resolution Engineering rolled the update back in all regions. Service was fully restored by 18:20 UTC, and the incident was then declared resolved. We’ve also built and tested a permanent fix that removes the incompatible component. Corrective Actions To keep this from happening again, we’ve added new alerts that trigger when image-retrieval traffic drops sharply. We’re also adding health checks that confirm images load end to end, testing new builds with realistic image requests before they go live, and pausing a rollout automatically if service quality drops in any region.
resolved ·
The issue affecting client-hosted images in Studio has been fully resolved, and all affected images are now loading as expected. Our Engineering team has confirmed that the service is operating normally. We apologize for any disruption this may have caused. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be published within 7 business days.
monitoring ·
Our Engineering team has implemented a fix, and client-hosted images are now loading as expected in Studio. We are continuing to monitor the service to ensure stability and will provide another update within the next hour.
investigating ·
We are currently investigating an issue where client-hosted images are not displaying as expected in Studio, impacting product grids and creative previews for some customers. Our Engineering team is actively investigating the issue. We will provide another update within the next hour or sooner if additional information becomes available.
· lasted 3h 13m
Affected: Web App
postmortem ·
Postmortem Incident Summary On October 13, 2026, between approximately 19:22 UTC and 22:47 UTC \(3:22 PM–6:47 PM ET\), some Da Vinci users were unable to log in to the platform. Users who sign in with a username and password were affected. Users who log in through single sign-on \(SSO\) were not. While the issue lasted, affected users were unable to build or approve campaigns. The issue was caused by a mismatch between two changes made during the same period. A configuration update to our login and authentication service was applied on the expectation that a specific platform release was running. The platform was running an earlier release at the time, and the two were not compatible. This caused login requests to fail. Resolution Our Engineering team identified the mismatch and applied a fix so that the platform and the authentication configuration were compatible again. Affected users were asked to log out and log in again. Engineering then confirmed successful logins across the affected accounts and worked with Technical Support to follow up on users who continued to see errors. Service was fully restored by 22:47 UTC, after which the incident was declared resolved. No campaign data was lost as a result of this incident. Corrective Actions To prevent a similar issue, we are adding a verification step to our process. Before any change to the authentication configuration, the team will confirm that the version of the platform running in production matches the version the change depends on. We are also reviewing how we communicate which version is live following a deployment, so the information is clearer for the team making changes. We apologize for the disruption this caused and appreciate your patience. Please reach out to the Technical Support team if you have any questions.
resolved ·
The login issues affecting the DaVinci platform have been fully resolved. Users should now be able to log in to their accounts as normal. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be published in 7 business days.
monitoring ·
Our Engineering Team has deployed a fix, and all users should be able to log in to the platform. We are still monitoring and update in the next hour.
investigating ·
Our Engineering team is still investigating this issue. We will provide an update in 1 hour.
investigating ·
Users may be experiencing trouble with logging into/accessing the DaVinci platform. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
resolved ·
Incident Summary: Between October 6, 2026 at 11:15 PM ET and October 7, 2026 at 1:30 AM ET, users experienced a disruption and period of increased latency for Studio content serving in our US East datacenter. Impact: - Studio content serving was disrupted and/or experiencing elevated latency - Scope limited to the US East datacenter region Status: Resolved as of October 7, 2026 at 1:30 AM ET Next Steps: We will follow up in 7 days with a post-mortem.
· lasted 1h 0m
Affected: Web App
postmortem ·
Postmortem Incident Summary On October 6, 2026, between approximately 15:27 UTC and 16:10 UTC \(11:27 AM-12:10 PM ET\), some Da Vinci users experienced difficulty accessing accounts on the platform. Users with access to multiple accounts or organizations received a “Permission denied” message when they tried to switch between them. Users who work in a single account were not affected. The issue was caused by a platform update intended to improve how account information is displayed on the Users page. The update unintentionally limited the list of accounts available to some users, so the platform rejected their attempts to switch to accounts they were authorized to access. The update was released to production before our planned testing was complete, so the issue was not caught before it reached users. Resolution Engineering identified the cause and resolved the issue by correcting the update so that users’ full list of accounts is available again. Users were able to switch between accounts as normal once the fix was in place. The issue was resolved within approximately 40 minutes of the update reaching production. Corrective Actions To reduce the likelihood of a similar issue recurring, we are strengthening our testing practices. Before changes that affect how users and accounts are retrieved are released, we will validate them against account-switching scenarios, including users with access to multiple organizations. We are also adding automated tests that confirm users can see and switch to all the accounts they are authorized to access. We apologize for the disruption and appreciate your patience. Please reach out to the Technical Support team if you have any questions.
resolved ·
The login issues affecting the DaVinci platform have been fully resolved. Users should now be able to login into their accounts as normal. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
investigating ·
Users may be experiencing trouble with logging into/accessing the DaVinci platform. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
postmortem ·
Incident Summary On October 1, 2026, between approximately 11:55 AM and 4:15 PM ET \(15:55–20:15 UTC\), Da Vinci experienced degraded performance in the systems that calculate campaign audience counts and process recommendation runs. Impact was most widespread between 2:25 PM and 4:15 PM ET \(18:25–20:15 UTC\). During this period, audience counts in the platform could fail to load, and recommendation runs and proof runs could fail or be delayed across multiple clients. Some users also experienced slower page load times. The issue was triggered by an unusually demanding audience request that took far longer than expected to complete. When these requests timed out in the platform, the underlying work was not stopped behind the scenes. Repeated attempts stacked up, consuming system capacity and slowing other requests, which led to additional timeouts. Resolution Engineering stopped the backlog of long-running requests and halted the activity that was generating them, and system performance returned to normal at approximately 4:14 PM ET \(20:14 UTC\) and remained stable. Affected jobs were restarted, and clients were advised to retry any failed runs. Full resolution was confirmed at approximately 6:30 PM ET \(22:30 UTC\). Corrective Actions To reduce the likelihood of a similar issue recurring, we are implementing several improvements. We are adding maximum run-time limits so that requests are automatically cancelled once they time out, rather than continuing in the background. We are also adding earlier alerting for system capacity strain and growing job backlogs, so issues can be identified before they affect clients. In addition, we are improving the experience in the platform so that users receive a clear message when an audience count cannot be completed, rather than repeatedly retrying. We are also optimizing the type of audience request that triggered this incident.
resolved ·
On October 1, between approximately 1:30 PM and 3:30 PM EDT, we experienced an issue that caused delays with data processing and campaign scheduling for some customers. This may have resulted in campaigns taking longer than expected to process, sync, or become ready for scheduled activity. The issue was identified and resolved, and affected services have returned to normal operation. We apologize for any disruption this may have caused. Please contact the Technical Support team if you continue to experience any issues or have additional questions. A post-mortem will be shared within 7 business days.
· lasted 1h 13m
Affected: Link Redirect
postmortem ·
## Incident Summary On July 30, 2026, between 20:13 UTC and 21:54 UTC \(4:13 PM–5:54 PM ET\), Da Vinci experienced an interruption affecting HTTPS traffic on the `coherentpath.link` tracking domain. During this period, recipients clicking links in proof or production emails could encounter a browser security warning indicating that the site's security certificate had expired. Users generating or proofing campaigns that relied on the affected tracking domain could also experience the same error. Click and open events initiated during the incident were unable to reach Da Vinci's tracking service and therefore were not recorded. The issue was caused by the expiration of the TLS certificate serving `coherentpath.link` before a replacement certificate could be successfully provisioned. The renewal process was blocked because the certificate configuration still included domains associated with previously off-boarded clients. Since those domains no longer resolved to the production infrastructure, Google's managed certificate service was unable to issue the replacement certificate before the existing certificate expired. The issue was limited to HTTPS traffic. The underlying application and HTTP endpoint remained available throughout the incident. ## Resolution Engineering restored service by removing obsolete client domains from the certificate configuration and updating the production infrastructure to use a valid certificate while a replacement managed certificate was provisioned. Once the updated certificate was deployed, the team validated HTTPS connectivity across the affected environments and re-synchronized impacted creatives to regenerate valid tracking links.Service was fully restored by 21:54 UTC, after which the incident was declared resolved. ## Corrective Actions To reduce the likelihood of a similar issue recurring, we are implementing several improvements to certificate and infrastructure management.We are adding proactive monitoring to alert on upcoming certificate expirations at least 14 days in advance, as well as alerts for managed certificate provisioning failures so renewal issues can be identified before they impact production. We are also strengthening the client off-boarding process to ensure retired domains are removed from both ingress configuration and certificate definitions as part of the standard workflow. In addition, production load-balancing resources will be brought under infrastructure-as-code management to reduce configuration drift and simplify future incident response. Monitoring around domain health, certificate status, and production routing will also be expanded to improve detection and diagnosis of similar issues.
resolved ·
The updated security certificate has been deployed, and Da Vinci click-through links are now functioning as expected. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
investigating ·
We are investigating an issue impacting Da Vinci click-through links due to an expired security certificate. Our Engineering team is actively working to resolve the issue and will provide an update as soon as more information is available.
· lasted 1h 4m
Affected: Web App
postmortem ·
Incident Summary On July 23, 2026, between approximately 4:15 AM and 9:23 AM EDT \(08:15 to 13:23 UTC\), a large number of Studio users could not log in or reach the platform. The problem affected multiple customer accounts and every login method, including single sign-on. The issue began when Auth0, our login provider, changed how it connects to Studio, and our system wasn’t updated to recognize the change, so sign-ins were blocked. Our monitoring didn’t catch it automatically, and we first learned of it from customer reports. Resolution Our Engineering team found the cause and updated the approved address list. The first two updates did not take effect because of configuration mistakes on our end, which lengthened the outage. The third update worked, and we verified that logins were back to normal and that users could once again access Studio. Corrective Actions * Making our approved address list easier to manage reliably, so that a formatting mistake can’t quietly cause failures. * Adding monitoring and alerts that notify us within minutes of a rise in login failures, rather than depending on customer reports. * Documenting the update procedure and requiring a verification step before any change is considered complete. * Assigning a clear owner and process for reviewing advance notices from third-party providers, including Auth0. We apologize for the disruption and for how long it took to resolve. If you have questions or are still seeing login issues, please contact Movable Ink Support.
resolved ·
This incident has been resolved by our engineering team. All services have been restored and users are able to access Studio again.
identified ·
The issue has been identified by our Engineering team and a fix will be implemented shortly
investigating ·
Users may be experiencing trouble with logging into/accessing the Studio platform. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
resolved ·
Between 11:11 PM ET on June 28, 2026 and 12:04 AM ET on June 29, 2026, Studio experienced a content serving disruption affecting requests routed through our US-East region. Requests routed through our EU or US-West regions were unaffected and completed normally. Our Engineering team has confirmed that content serving has fully recovered and the platform is operating normally. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
Affected: Web App
postmortem ·
## Incident Summary Between 1:23 PM ET and 3:34 PM ET on June 2, 2026, some users working across multiple workspaces experienced issues duplicating content blocks and targeting settings within campaigns. The issue primarily affected users working in workspaces other than their primary workspace, preventing duplication actions from completing successfully. ## Resolution The issue was caused by a recent platform update that impacted how certain workspace actions were processed. While most functionality continued to work as expected, the duplication workflow was affected for some multi-workspace users. Our team identified the issue, implemented a fix, and verified that duplication functionality was fully restored by 3:34 PM ET on June 2, 2026. ## Corrective Actions To help prevent similar issues in the future, we are: * Enhancing monitoring and alerting for workspace-related workflows. * Expanding testing for multi-workspace user experiences. * Strengthening release validation processes to ensure all related functionality is included in future platform updates.
resolved ·
The issue affecting the duplication of Blocks and Targeting has been resolved. Users should no longer experience any issues when attempting to duplicate Blocks or Targeting within a campaign, and duplication actions should now complete as expected. Our Engineering team identified the root cause, deployed a fix, and has confirmed that normal functionality has been restored. We are continuing to monitor the system to ensure stability. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
We are continuing to work on a fix for this issue.
identified ·
We are currently investigating an issue affecting Campaign editing in Studio. Users may experience errors when attempting to duplicate Targets or Blocks within a Campaign. As a result, duplication actions may fail or not complete as expected. Our Engineering team has developed a fix and is currently deploying it to restore normal functionality. Start Time: June 2, 2026, 13:00 EST Next Update: Within 60 minutes or sooner if significant progress is made.
· lasted 1h 56m
Affected: Analytics, Data Processing
postmortem ·
## Incident Summary On June 1, 2026, Analytics and Proofing experienced a service disruption where users were unable to run queries or load dashboards. Studio was not impacted. The issue was detected at 13:18 UTC \(09:18 ET\) via monitoring and confirmed shortly after through customer reports. ## Root Cause A routine security certificate update from a third-party database provider was incorrectly rejected by an outdated platform runtime, which did not recognize the updated certificate chain. This resulted in failed connectivity and service disruption for Analytics and Proofing. ## Resolution The issue was resolved by upgrading the affected runtimes to a patched version that properly validates updated certificate chains. * Analytics restored: 15:41 UTC \(11:41 ET\) * Proofing restored: 16:15 UTC \(12:15 ET\) Normal service resumed after deployment of the fix across impacted environments. ## Corrective Actions * Detection: Improve alerting for connectivity failures and spikes in query/API error rates. * Mitigation: Strengthen runbooks and ensure updated runtime artifacts are readily available during incidents. * Prevention: Subscribe to vendor release notifications \(RSS/mailing lists\) and improve automated tracking of runtime and dependency versions to prevent stale components.
resolved ·
We are pleased to confirm that all previously reported issues have been resolved and the platform is now fully functional. All impacted services, including Analytics and Proofing, are operating normally. Our engineering team has completed remediation efforts and continues to monitor system performance to ensure stability. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
We have restored normal functionality for the Analytics dashboard. Customers should now be able to access Analytics data without issues. However, engineering team is actively working on a fix for the proofing issue. At this time: Analytics: Fully operational Proofing: Degraded / unavailable We will continue to monitor Analytics closely and provide further updates as progress is made on Proofing. Our next update will be shared in an hour.
identified ·
We are currently investigating an issue affecting Analytics and Proofing services. Customers may experience intermittent availability when accessing Analytics data and Proofing functionality. Our engineering team identified the cause and is actively working on a fix. We understand the importance of these services and are prioritizing resolution of the issue. We will continue to provide updates as more information becomes available. Start Time: June 1, 2026, 13:18 UTC Next Update: Within 60 minutes or sooner if significant progress is made.
· lasted 25h 13m
Affected: Analytics
resolved ·
The issue affecting unsubscribe metrics in Da Vinci Analytics has been fully resolved. The overnight backfill has completed, and all unsubscribe data is now up to date in the Analytics UI. No unsubscribe data was lost during this incident. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
The issue affecting unsubscribe metrics in Analytics has been resolved. Unsubscribe data for campaigns sent in the last day, on or after May 25, should now be updated in the Analytics UI. Data for campaigns sent before May 25 will be updated after the next aggregation completes tonight. We will continue monitoring and provide another update once the remaining historical data has been backfilled.
investigating ·
Users may be experiencing missing or delayed unsubscribe metrics in our analytics dashboards. This may affect visibility into unsubscribe activity for impacted accounts. Our Engineering team is currently working through the required backfill, and no unsubscribe data has been lost. We will post another update in 1 hour.
· lasted 1h 52m
Affected: Web App
resolved ·
The issue regarding campaign/creative syncing and proofing has been fully resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
A fix for Campaign Syncing and Proofing has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 1 hour.
investigating ·
Users may be experiencing trouble with proofing/syncing issues in Da Vinci - this is affecting both campaigns and creatives. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted 4h 46m
Affected: Web App
postmortem ·
## Incident Summary On May 12, 2026, between approximately 12:00 PM EDT and 1:07 PM EDT, some users experienced difficulty logging into the Movable Ink Studio platform. Affected users received an error message upon attempting to sign in and were unable to access their accounts. Our Engineering team was alerted to the issue and began investigating promptly. The issue resolved within approximately one hour, and normal login functionality was restored for all users. ## Resolution Our Engineering team investigated the platform's authentication service and applied a corrective fix. Login functionality was confirmed restored by approximately 1:07 PM EDT on May 12, 2026. All users were able to successfully sign in following the fix, and the platform has been stable since. ## Corrective Actions We are committed to improving the reliability and resilience of our platform's authentication service. As a result of this incident, we are reviewing our monitoring and alerting capabilities to improve earlier detection of authentication disruptions, and evaluating additional safeguards to reduce customer impact and recovery time in the event of a similar issue in the future.
resolved ·
The login issues affecting the Studio platform have been fully resolved. Users should now be able to login into their accounts as normal. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
Engineering has pushed a quick fix, and users are now able to log in successfully. We are continuing to monitor and will share the next update in 60 minutes.
investigating ·
We are continuing to investigate login issues affecting the Movable Ink platform. Our Engineering team is still investigating the root cause. We will post another update in 60 minutes.
investigating ·
Users may be experiencing trouble logging into the Movable Ink platform. Our Engineering team is currently investigating. We will post an update in 60 minutes.
· lasted 5h 1m
Affected: Analytics
postmortem ·
## Incident Summary Between 6:44 PM ET on May 7, 2026 and 11:45 AM ET on May 8, 2026, Studio users experienced degraded performance and errors when accessing Studio Analytics and Reporting features, including Custom Reports, Analytics Explorer, and Campaign Analytics. During this window, users may have encountered timeouts, blank pages, error messages, or delayed/older analytics data when attempting to generate or load reports. The disruption was caused by an upstream availability issue with a cloud infrastructure provider that supports the backend services powering Studio's analytics and reporting capabilities. Content serving and live campaign delivery were not affected at any point during this incident, and all customer-facing campaigns continued to deliver normally. The issue was first detected at 6:44 PM ET on May 7, 2026 through internal monitoring and alerting. Our team engaged with the upstream provider and worked closely with them throughout the incident window to restore service. ## Resolution Service was restored at 11:45 AM ET on May 8, 2026 once upstream provider availability returned to normal operation. Our team verified that all internal systems came back online, confirmed full functionality across Studio Custom Reports, Analytics Explorer, and Campaign Analytics, and validated that there was no impact to data quality or accuracy once services recovered. No data loss occurred as a result of this incident, and reporting data reflected complete and accurate values once analytics functionality was restored. ## Corrective Actions To reduce the likelihood and customer impact of similar incidents in the future, we are taking the following actions: * Strengthened response coverage: Expanding our response and monitoring team to improve earlier detection and faster engagement when upstream availability events affect platform functionality. * Clearer customer communications: Evaluating improvements to our customer-facing messaging when backend availability is impacted by upstream outages, so customers have clearer visibility into scope, expected timing, and which platform functionality is or is not affected.
resolved ·
The issue affecting Studio Analytics and Reporting has been resolved. Analytics services are now back online, and Studio Custom Reports, Analytics Explorer, and Campaign Analytics should be operating as expected. Our team will continue monitoring for stability. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
investigating ·
Users may experience timeouts, blank pages, delayed analytics data, or failures when accessing Studio Custom Reports, Analytics Explorer, and Campaign Analytics. In some cases, reporting data may appear delayed or reflect older results. This issue is related to an upstream problem with our cloud provider affecting our Analytics services. Our team is actively working with the service provider to restore full functionality. Content serving is not impacted, and live campaigns continue to deliver normally. We will provide another update as soon as more information is available.
· lasted under a minute
postmortem ·
## Incident Summary On May 7, 2026, between approximately 11:07 AM ET and 11:23 AM ET, customers in the US region experienced failures rendering Movable Ink Studio content that relied on data source lookups. During this window, content backed by data sources failed to render correctly, returning errors instead of the expected personalized content. The incident lasted approximately 16 minutes. The incident was triggered by a planned platform update made as part of retiring a legacy product feature. The update removed components that a downstream content rendering service still depended on. Pre-deployment validation did not identify this dependency, which caused data source lookups to fail immediately after the change was applied. The issue was detected automatically by our monitoring and alerting systems within seconds of the first errors appearing. ## Resolution Upon detection, our Engineering team investigated the error pattern, identified the source of the failure, and applied a corrective fix to restore the components required by the content rendering service to their expected state. Normal data source functionality and content rendering resumed by approximately 11:23 AM ET. No further action is required by customers. ## Corrective Actions To reduce the likelihood and impact of similar incidents in the future, we are taking action across detection, mitigation, and prevention. We will add higher-signal alerting for this class of error to enable faster diagnosis, and improve our internal escalation process so that customer-impacting issues are surfaced to support teams in parallel with Engineering response. We will require that platform changes of this type be reversible wherever practical and standardize recovery procedures to enable faster response if a similar issue occurs. We will also introduce automated validation that checks planned platform changes against all services that may depend on the affected components, evaluate whether legacy components need to be removed when the risk outweighs the benefit, and explore ways to make cross-service dependencies more explicit and easier to validate before changes are applied.
resolved ·
The issue affecting data sources has been resolved. Our Engineering team completed a rollback, and data source functionality is now operating as expected. The issue occurred between approximately 11:07 AM ET and 11:23 AM ET. We are continuing to review any potential impact during this window. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
· lasted 2h 4m
Affected: Content Rendering
postmortem ·
## Incident Summary On April 29, 2026, Movable Ink identified an issue where some Studio-rendered content could intermittently fail to load in email environments. In affected cases, images that should have rendered consistently may have appeared as missing, broken, or fallback content on some opens or refreshes, while rendering correctly on others. Our investigation found two contributing factors. First, some requests used to retrieve customer-hosted assets were being blocked by external CDN or security-layer configurations, which caused elevated rendering errors for certain content. Movable Ink applied an initial mitigation to address this condition, and the related error rate decreased significantly. However, because some customers continued to report intermittent rendering behavior after the initial mitigation, Engineering continued investigating. That follow-up investigation identified a separate issue affecting the US-West rendering path, where some rendering requests could be routed through infrastructure that did not have the most current campaign data available. This caused newer or recently updated campaign content to intermittently fail depending on which backend path served the request. Because both issues could result in similar customer-facing symptoms, the first mitigation improved the overall error rate but did not fully resolve every reported rendering failure. ## Resolution Movable Ink first mitigated the external asset retrieval failures by updating the infrastructure used to retrieve customer-hosted content, which significantly reduced the related error rate. After additional investigation, Movable Ink identified and removed the affected US-West backend path from serving rendering requests. Once this was completed, rendering traffic was routed only through synchronized and current infrastructure, resolving the intermittent rendering behavior. Following the fix, affected examples were retested and confirmed to be rendering as expected. ## Corrective Actions Movable Ink is improving monitoring to detect when backend infrastructure serving production rendering traffic is not fully synchronized with the latest campaign data. This will allow Engineering to identify and respond to similar conditions more quickly in the future. We are also standardizing the outbound infrastructure used to retrieve customer-hosted assets so customers who maintain CDN, WAF, or IP-based allowlisting can allowlist a more predictable set of Movable Ink requests. This should reduce the likelihood of customer security layers incorrectly blocking legitimate rendering traffic in the future.
resolved ·
This incident has been resolved.
monitoring ·
A fix for the Studio Content rendering issues has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, in the short term we may continue to see image load failures as images are served from caches but given some time the caches will clear and images will be served as expected. We will check back in tomorrow morning ET.
investigating ·
We are continuing to investigate this issue. We will post another update in 1 hour.
investigating ·
Users may be experiencing intermittent issues with Studio content rendering within email environments. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
postmortem ·
## Incident Summary On April 22, 2026, some users experienced issues with Studio data sources and dynamic content rendering. During the incident window, certain CSV data source uploads or downloads may have failed or returned unexpected header formatting, and some dynamic content experiences may have displayed fallback content instead of the expected personalized or localized content. The incident was caused by a backend data migration change that introduced unexpected errors in how some data source information was processed. These errors affected downstream rendering and data source workflows for a subset of Studio use cases. Technical Support escalated the issue to Engineering after customer-facing symptoms were reported. Engineering investigated the errors, identified the migration-related change as the source of the issue, and reverted the affected change. A secondary data correction was then completed to address remaining data source header issues. ## Resolution Engineering reverted the backend change that caused the data source processing errors. After the revert, the related platform errors stopped and dynamic content rendering began recovering. Engineering then completed additional corrective work for the affected data sources where header formatting had been impacted. Once those data sources were corrected and validated, uploads, downloads, previews, and rendering behavior returned to normal. The platform was monitored afterward to confirm continued stability before the incident was marked as resolved. ## Corrective Actions To reduce the likelihood of similar incidents in the future, Engineering is adding additional validation and guardrails around data source processing to prevent malformed or unexpected header data from being introduced. We are also improving monitoring and alerting for elevated backend error rates so similar issues can be detected earlier and investigated more quickly. In addition, Engineering will strengthen migration testing and release validation for backend changes that may impact Studio data source workflows or dynamic content rendering. We will continue to improve our deployment validation, monitoring, and incident response processes to reduce the likelihood and impact of similar issues in future releases.
resolved ·
Between 8:48 AM and 1:00 PM EDT on April 22, 2026, some users may have experienced issues with dynamic content rendering for certain campaigns. During this time, some dynamic content may have displayed fallback images instead of the expected personalized or localized experience, and some users may also have encountered unexpected header changes affecting uploads and downloads. Our Engineering team investigated the issue and implemented a fix. Dynamic content rendering has been restored and functionality is now operating normally. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
· lasted 3 days
Affected: Web App
postmortem ·
Incident Summary Between 00:01 and 00:23 UTC on April 18, 2026, audience tags across a subset of customer accounts were incorrectly deleted from production. The event was triggered by a deployment at 19:15 UTC on April 17, 2026. The deployment contained a new scheduled task intended to automatically delete audience data tags that had passed their configured expiration date. An issue in this code caused the task to also delete tags with no expiration date set, treating the absence of an expiration as if the tag were already expired. The event was detected by our Technical Support team at 16:51 UTC on April 18, reporting a missing audience for one of our clients. Detection was delayed as the deletion did not trigger any automated alerting thresholds. The team reviewed system logs to confirm which tags had been deleted and which audiences were impacted. The root cause was identified as the faulty cleanup task, and a restoration was coordinated from a database backup. Resolution The team restored all deleted tags and data tables including tag columns from backups. Impacted audiences were restored from a recent backup. All deleted tags were recreated by approximately 21:00 UTC on April 18, with work on restoring associated audience data continuing through 02:45 UTC on April 19. We have communicated directly with all impacted clients. Corrective Actions We have disabled the feature in production. We will fix the code issue that caused faulty tag deletion and thoroughly test the fix in staging prior to re-release. We will also enforce additional release controls to prevent this type of issue from occurring in the future.
resolved ·
Engineering has identified and resolved the issue impacting audience integrity within campaign workflows. All future campaigns are confirmed to be functioning correctly. Mitigation has been fully completed, including tag restoration, data restoration, and rerunning of campaign data to ensure audience accuracy across impacted campaigns. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
monitoring ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering and TS are working through stage 3. We will provide an update in another 60 minutes
monitoring ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering and TS are working through stage 3. We will provide an update in another 60 minutes
monitoring ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering and TS are working through stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. TS is working through stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. TS is working through stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. TS is working through stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. TS is working through stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. TS is beginning stage 3. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. We will provide an update in another 30 minutes
identified ·
Mitigation Stages: 1. Tag Restoration 2. Data Restoration 3. Standard Recommendation Reruns Engineering is still engaged in stage 2 of the mitigation process. We will provide an update in another 30 minutes
identified ·
The first of a 3 stage mitigation process has been implemented. Engineering is working on stage 2 which is data restoration. Once that is complete we will move forward with rerunning Standard Recommendations. We will post an update in an hour.
identified ·
Engineering is working through implementing a solution in phases. We are monitoring their progress and will provide an update in 3 hours
identified ·
Engineering is continuing to investigate solutions. We will post another update in 1 hour.
investigating ·
Engineering is continuing to investigate solutions. We will post another update in 1 hour.
identified ·
Engineering has identified the root cause and is investigating potential solutions. We will post an update in 1 hour.
investigating ·
Users may be unable to find audiences or expected tags within audiences. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted 6h 17m
Affected: Web App
postmortem ·
## Incident Summary On April 16, 2026, users may have experienced slower-than-normal performance within the Da Vinci platform. This included delays when viewing campaigns and creatives, as well as issues with actions such as locking campaigns or generating proofs. The issue began after a planned deployment that included platform updates and bug fixes. One of the changes introduced unexpected performance impact, which caused parts of the platform to respond slowly and, in some cases, time out. Technical Support escalated the issue to Engineering, and Engineering began investigating shortly after. Once the source of the performance degradation was identified, the related change was reverted. ## Resolution Engineering identified the change that was causing the increased platform load and reverted it. As the revert was deployed, platform performance began to recover, and normal operation resumed. The system was then monitored to confirm performance stability before the incident was marked resolved. ## Corrective Actions To help prevent similar issues in the future, Engineering has added additional monitoring and alerting for sustained elevated platform load. This will help teams detect abnormal performance conditions earlier and respond more quickly before users experience broader impact. We will continue to improve our monitoring, deployment validation, and response processes to reduce the likelihood of similar performance issues in future releases.
resolved ·
The issue regarding Platform Slowness has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
Engineering has identified the issue causing the slowness and has put a fix in place. Web performance seems to be improving and we will continue to monitor.
investigating ·
Engineering is still investigating this issue. We will provide an update in 1 hour.
investigating ·
Users may be experiencing trouble with slow load times within the Da Vinci platform. Our Engineering team is currently investigating. We will post an update in 60 minutes.
· lasted 2h 11m
Affected: Web App
postmortem ·
## Incident Summary On April 15, 2026, some users experienced issues accessing the Da Vinci Web App. The issue occurred during a planned deployment when one of the deployment steps took longer than expected to complete. During this period, access to the Da Vinci Web App was temporarily impacted. Our Engineering team identified the issue during deployment monitoring and took action to restore access. Platform access was restored, and the system was monitored to confirm stability. ## Resolution Engineering resolved the issue by clearing the blocked deployment process and allowing the deployment to complete successfully. Once the deployment stabilized, normal access to the Da Vinci Web App was restored. ## Corrective Actions To help prevent similar issues in the future, we are updating our deployment safeguards for changes that may affect high-traffic areas of the platform. These safeguards are designed to ensure deployment steps fail quickly if they encounter blocking conditions, rather than impacting platform availability. We will continue to improve our deployment processes and monitoring to reduce the risk of similar access issues in future releases.
resolved ·
The issue impacting access to the Da Vinci Web App has been fully resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
A fix has been implemented for the Da Vinci Web App, and platform access has been restored. We are currently monitoring system stability. We will provide another update within 1 hour.
investigating ·
Users may be experiencing issues accessing the Da Vinci Web App. The Engineering team is currently investigating. We will provide an update within 1 hour.
· lasted 1h 41m
Affected: Data Processing
postmortem ·
Incident Summary On March 24, between approximately 2:00 AM and 10:22 AM EDT, some clients experienced delays with campaign syncing and proof generation. This was first observed during early morning proofing activity. The issue was caused by a recent system update that unintentionally impacted data processing performance. As a result, some campaigns experienced delays in completing processing and generating proofs. Resolution Our Engineering team identified the issue and implemented changes to stabilize system performance. An additional update was applied to fully resolve the problem. Following these changes, campaign processing and proof generation returned to normal. Corrective Actions To help prevent similar issues in the future, we have enhanced monitoring to detect early signs of system performance degradation and implemented improvements to increase system stability and reliability. We will continue to monitor the platform to ensure consistent performance.
resolved ·
The issue impacting campaign syncing and proofing delays has been resolved. Please reach out to the Technical Support team if you continue to experience any issues or have additional questions. A post-mortem will be shared within 7 business days.
monitoring ·
A fix has been implemented for the delays impacting campaign syncing and proofing. Previously impacted proof runs are now being processed, and users may resume running proofs as expected. We are continuing to monitor the system to ensure the issue is fully resolved and will provide the next update in 1 hour.
investigating ·
Users may be experiencing delays with campaign syncing and proofing. As a result, some campaigns may take longer than expected to complete processing. Our Engineering team is actively investigating the issue. We will provide an update within 1 hour.
· lasted 3h 21m
Affected: Content Rendering
postmortem ·
## Incident Summary On February 9th, a code change was introduced to improve Scratch Off preview functionality by adding abstraction to the `landing_page_config`. This change allowed previews to render without relying on deployment-specific variables. While this resolved preview issues for US-based accounts, it unintentionally exposed a configuration gap for EU environments. Specifically, a required region-specific value \(`landing_page_domain`\) was not properly defined for EU, resulting in preview failures and HTTP 500 errors during the Review step. Users were unable to preview Scratch Off and Peel Off tactics in Studio. The issue was limited to preview functionality only; live content rendering was not impacted. The impact was primarily observed in EU-hosted environments. ## Resolution The issue was resolved by correctly configuring the EU-specific `landing_page_domain` within the `mi_charts` service. ## Corrective actions To prevent similar issues in the future, we will establish dedicated sandbox environments for both US and EU regions to improve QA coverage for region-specific configurations. Additionally, we will enhance validation checks to ensure all required region-specific configuration values are present before deployment, and expand testing coverage for preview-related functionality across environments to reduce the risk of similar regressions.
resolved ·
The issue regarding Scratch off and Peel off Preview Not Rendering has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
A fix for Scratch off and Peel off Previews has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 1 hour.
investigating ·
We are continuing to investigate this issue. We will post another update in 1 hour.
investigating ·
We are continuing to investigate this issue. We will post another update in 1 hour.
investigating ·
Users may be experiencing trouble with previewing Scratch off and Peel off campaigns and tactics. This only impacts preview; no live content is impacted. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
postmortem ·
## Incident Summary Between approximately 9:47 PM EST on March 4 and 11:09 AM EST on March 5, some users experienced issues importing Studio content into Da Vinci creatives. During this time, attempts to load Studio content within the Da Vinci editor resulted in authorization errors that prevented the content from being imported successfully. The issue was identified after reports were received and was traced to an integration problem affecting communication between Studio and Da Vinci. ## Resolution Our Engineering team investigated the issue and implemented a fix to restore the integration between the two systems. Once the fix was deployed, normal functionality was restored and users were able to successfully import Studio content into Da Vinci creatives. ## Corrective actions To help prevent similar incidents in the future, we are implementing additional automated testing to validate the integration between Studio and Da Vinci after production deployments. This will help ensure that integration functionality is verified as part of our deployment process and allow issues to be detected earlier.
resolved ·
Between the hours of 9:47 PM EST on March 4 and 11:09 AM EST on March 5, some users experienced issues importing Studio content into Da Vinci creatives due to an authorization error affecting the Studio–Da Vinci integration. Our Engineering team investigated the issue and deployed a fix. The integration has been restored and functionality is operating normally. During the incident, a workaround was available that allowed users to retrieve the embed code directly from Studio and manually paste it into the Da Vinci library to continue configuring creatives. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
· lasted 33h 56m
Affected: Data Processing
postmortem ·
## Incident Summary Between approximately 3:00 PM EST on February 26 and 1:30 PM EST on February 28, a handful of clients experienced delays in campaign processing. Under certain campaign configuration conditions, processing times increased significantly, preventing affected campaigns from progressing through the scheduling stage. In some client cases, this resulted in a missed mailing deadline. The issue was introduced during a recent system update but did not initially manifest. It was later activated when the update was fully rolled out on February 26. The defect primarily impacted accounts running multiple campaigns simultaneously with complex configurations, which caused processing jobs to take significantly longer than expected and eventually fail. The issue was detected through our internal monitoring and incident management processes, and Engineering teams began investigating immediately. ## Resolution Engineering teams worked to identify and isolate the defect. Additional system resources were temporarily allocated to stabilize processing while the root cause was identified. A corrective fix was developed, tested, and deployed. All impacted campaigns were successfully reprocessed and scheduled following the fix. Resolution time was extended due to the intermittent nature of the issue, which required controlled reproduction of the problem before a permanent fix could be implemented. ## Corrective actions To prevent recurrence and reduce the impact of similar issues in the future, we are enhancing safeguards within the campaign processing workflow and improving monitoring to detect abnormal processing behavior earlier. We are also strengthening deployment controls to further limit potential customer impact during feature rollouts and implementing improved rollback mechanisms to accelerate recovery if needed. These measures are intended to increase overall system resilience and reduce the likelihood and duration of similar disruptions.
resolved ·
The issue impacting campaign data processing for certain campaigns scheduled for 2/27 and 2/28 has been resolved. Affected campaigns have been successfully reprocessed and are now scheduled accordingly. We will continue to monitor the system to ensure stability. Please reach out to the Technical Support team if you continue to experience issues or have additional questions. A post-mortem will be shared within 7 business days.
monitoring ·
We are continuing to monitor 2/28 campaigns until they are fully scheduled. We will provide the next update in 3 hours.
monitoring ·
We are continuing to monitor 2/28 campaigns until they are fully scheduled. We will provide the next update in 3 hours.
monitoring ·
We are continuing to monitor 2/28 campaigns until they are fully scheduled and provide the next update in 3 hours.
monitoring ·
Most campaigns for 2/27 are now successfully scheduled. We will continue monitoring the remaining impacted campaigns and provide the next update in 2 hours.
monitoring ·
Most campaigns for 2/27 are now successfully scheduled. We will continue monitoring the remaining impacted campaigns and provide the next update in 3 hours.
monitoring ·
Most campaigns for 2/27 are now successfully scheduled. We will continue monitoring the remaining impacted campaigns and provide the next update in 2 hours.
monitoring ·
Most campaigns for 2/27 are now successfully scheduled. We will continue monitoring the remaining impacted campaigns and provide the next update in 2 hours.
monitoring ·
We are continuing to monitor until all impacted 2/27 campaigns are fully scheduled. We will provide the next update in 2 hours.
monitoring ·
We are continuing to monitor until all impacted 2/27 campaigns are fully scheduled. We will provide the next update in 2 hours.
monitoring ·
A fix has been implemented for the data processing delays impacting certain campaigns scheduled for 2/27. Our Engineering team has initiated reprocessing of the affected campaigns. We will continue monitoring to ensure the issue is fully resolved and will provide another update in 1 hour.
investigating ·
Users may be experiencing delays in completing data processing for campaigns scheduled for 2/27. Our Engineering team is actively investigating the issue. We will post an update in 1 hour.
· lasted 3h 32m
Affected: Web App
postmortem ·
## Incident Summary Between approximately 11:58 AM EST and 12:30 PM EST on February 12, 2026, multiple components of the Da Vinci Web App experienced degradation. During this time, users encountered issues loading campaigns, and some campaigns became stuck in syncing or proofing. In certain cases, opening a campaign resulted in a loading page that did not complete, and operations such as proofing and recommendation runs reported failures. This was caused by a database migration that inadvertently locked a table containing key campaign information. As a result, the Web UI and background operations such as syncing, proofing, and recommendation processing were unable to access the data required to complete successfully. There was no data loss. The issue was detected by an automated alert indicating that the Web UI had become unresponsive at 11:59 EST. Engineering began investigating immediately. ## Resolution The deployment process was cancelled and the migration was aborted, which released the database lock and restored normal platform functionality. ## Corrective actions The Engineering team identified and implemented a tool to flag potential lock risks in future database migrations to reduce the likelihood of recurrence.
resolved ·
The issue impacting access to the Da Vinci Web App has been fully resolved. Campaign syncing and proofing are now functioning normally. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
A fix has been implemented for the Da Vinci Web App, and platform access has been restored. We are currently monitoring system stability. Some campaigns may still be temporarily stuck in syncing or proofing. The team is actively clearing the backlog to restore normal processing. We will continue monitoring and provide another update within 1 hour.
investigating ·
Users may be experiencing issues accessing the Da Vinci Web App. The Engineering team is currently investigating. As a result, some campaigns may experience delays in syncing and proofing. We will provide an update within 1 hour.
· lasted 4h 53m
Affected: Web App
postmortem ·
## Incident Summary Between approximately 02:30 AM EST and 02:11 PM EST on February 10, 2026, there were intermittent outages that prevented campaigns from loading. During this period, users experienced issues with campaigns becoming stuck during syncing, and in some cases, proofing and related operations were delayed. The event was triggered by a code change that altered the way database connections were handled by the web API used to retrieve campaign information. The code change introduced a defect in database connection handling which, under certain conditions, caused database connections to close unexpectedly. When this occurred, subsequent requests attempting to reuse those connections failed, preventing campaign data from loading properly in the UI. ## Resolution Engineering implemented a temporary mitigation at 03:49 AM EST to stabilize the platform and reduce customer impact. The issue was fully resolved at 14:11 EST with the deployment of a corrective code change that restored proper database connection handling. Following deployment, affected syncing and proofing operations resumed normal processing. ## Corrective actions The Engineering team identified additional metrics that can be instrumented and monitored to enable earlier detection and alerting should a similar issue occur in the future.
resolved ·
The issue impacting the Da Vinci campaign syncing has been fully resolved. If you continue to experience any issues or have questions, please reach out to the Technical Support team. A post-mortem will be shared within the next 7 business days.
monitoring ·
The Engineering team has deployed a fix for the Campaign Syncing issue. We are continuing to monitor platform stability to ensure full resolution and will provide another update by 6 PM EST, or sooner if there are any changes.
identified ·
Our Engineering team is still actively working on the Campaign Syncing issue. We will provide the next update within the next 60 minutes, or sooner if there are any changes.
identified ·
A fix for the Campaign Syncing issue has been identified and is currently being deployed. We are continuing to monitor the system to ensure the issue is fully resolved and will provide another update in 30 minutes.
investigating ·
Users may experience issues with campaigns getting stuck during syncing. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted 13h 16m
postmortem ·
## Incident Summary Between approximately 02:30 AM EST and 02:11 PM EST on February 10, 2026, there were intermittent outages that prevented campaigns from loading. During these outages, opening a campaign resulted in a loading page that did not complete. The event was triggered by a code change that altered the way database connections were handled by the web API used to retrieve campaign information. The code change introduced a defect in database connection handling which, under certain conditions, caused database connections to close unexpectedly. When this occurred, subsequent requests attempting to reuse those connections failed, preventing campaign data from loading properly in the UI. ## Resolution Engineering implemented a temporary mitigation at 03:49 AM EST to stabilize the platform and reduce customer impact. The issue was fully resolved at 14:11 EST with the deployment of a corrective code change that restored proper database connection handling. ## Corrective actions The Engineering team identified additional metrics that can be instrumented and monitored to enable earlier detection and alerting should a similar issue occur in the future.
resolved ·
The issue affecting the Da Vinci Platform including slow loading and pages that continued spinning when opening campaigns has been fully resolved. If you continue to experience this issue or have any questions, please contact the Technical Support team. A post-mortem will be published within 7 business days.
monitoring ·
The Engineering Team has deployed a final fix. We are still monitoring platform stability to ensure full resolution and will provide another update by 6 PM EST, or sooner if there are any changes.
monitoring ·
We will continue to monitor platform stability to ensure the issue is fully resolved and will provide another update by 2 PM EST, or sooner if there are any changes.
monitoring ·
Users may have experienced issues with the Da Vinci UI, including slow loading or pages that continued spinning when opening campaigns. Our Engineering team has identified the issue and applied a mitigation. The team is currently monitoring stability and will continue a deeper investigation this morning (EST). We will provide an update by 10 AM EST, or sooner if there are any changes.
· lasted 3 days
Affected: Analytics
postmortem ·
## Incident Summary Between 5:34 PM EST on January 29, 2026, and 9:40 AM EST on February 4, 2026, customers experienced delays in Send Analytics event data appearing in the Da Vinci analytics dashboards. The incident was triggered during an infrastructure migration on January 29 at 17:34 EST, intended to improve system reliability and performance. A change introduced during this migration temporarily revoked access permissions for the data processing service. Although permissions were restored within approximately 45 minutes, the service required a full redeployment to resume processing — which resulted in a backlog of send events. The issue was detected by the Engineering team on February 1 at 14:42 EST, at which point the team began investigating connection logs, identifying the permission issue, restoring access, and redeploying the service. ## Resolution Access permissions were restored and the data processing service was redeployed on February 1 at 19:54 EST, allowing event processing to resume normally. Over the following 2.5 days, the accumulated backlog of events was fully processed, with all historical data successfully backfilled by February 4 at 09:40 EST. To ensure data integrity, downstream deduplication mechanisms were applied to prevent duplicate records during recovery. Any temporary send count inaccuracies were flagged during this period and may persist for up to 30 days, after which finalized counts will automatically be corrected once all late-arriving data is reconciled. ## Corrective actions To prevent similar issues in the future, Engineering addressed the underlying connectivity problem that led to the permission disruption and updated the service’s polling mechanism to improve reliability. Additionally, event tracking safeguards were strengthened to better handle recovery scenarios and minimize the risk of duplicate data during incident recovery.
resolved ·
Send Analytics data has been fully processed and is now visible in the Analytics UI. All delayed data has been backfilled and reporting is operating as expected. This incident is now resolved. If you continue to experience issues or have additional questions, please reach out to the Technical Support team. A post-mortem will be posted within 7 business days.
monitoring ·
Send Analytics processing is operating normally. A small portion of historical Send Analytics data will be completed after the next aggregation cycle runs later tonight. We are monitoring and will provide another update by 10:00 AM EST tomorrow.
monitoring ·
The backlog of Send Analytics data has been processed and systems are operating normally. Some historical Send Analytics data may not be visible until the next aggregation cycle completes. We are monitoring and will provide another update by 6:00 PM EST.
identified ·
Our Engineering team continues to process the backlog of Send Analytics data. We will share another update by tomorrow morning by 10 AM EST.
identified ·
Our Engineering team continues to process the backlog of Send Analytics data. We will share another update by 6:00 PM EST.
identified ·
Our Engineering team continues to process the backlog of Send Analytics data. We will share another update by tomorrow morning by 10 AM EST.
identified ·
Our Engineering team continues to process the backlog of Send Analytics data. We will share another update by 6:00 PM EST.
identified ·
Our Engineering team has identified the issue and is working to clear and process the backlog of Send Analytics data. However, send logs for campaigns sent today should be available immediately in the Analytics UI. We will provide another update within the next two hours.
investigating ·
Da Vinci users may be experiencing missing Send Analytics data within the Da Vinci platform. This missing data may also cause downstream impact of non-personalized recommendations for subsequent sends. Our Engineering team is actively investigating the issue. We will provide another update within the next hour.
· lasted 4h 34m
Affected: Web App
postmortem ·
## Incident Summary Between approximately 12:15 PM EST and 1:00 PM EST on January 29, 2026, users experienced issues with campaigns failing to progress through Proof Runner and, in some cases, campaigns reverting from syncing back to draft. During this period, campaigns were unable to successfully move to the Ready to Proof stage, and proof preparation jobs were delayed or became stuck in processing. The issue was triggered by an unintended platform permission change that temporarily disrupted access to a backend messaging service responsible for processing audience queries, proof generation, and creative syncing jobs. As a result, related processing tasks were unable to execute as expected, which led to a backlog of queued jobs. Even after the underlying issue was corrected, the accumulated backlog contributed to continued slowness until normal queue processing levels were restored. The issue was detected through system monitoring alerts, and the Engineering team began investigating shortly thereafter. ## Resolution At approximately 1:00 PM EST, the unintended permission change was identified and reverted, restoring normal access to the affected backend service. Once connectivity was re-established, new proofing and syncing jobs began processing as expected. The existing backlog of queued jobs was gradually cleared, and impacted campaigns were unlocked and reprocessed where necessary. System performance returned to normal following queue stabilization. ## Corrective actions To reduce the likelihood and impact of similar incidents in the future, additional monitoring has been implemented to detect abnormal queue behavior more rapidly. The Engineering team has also reviewed internal permission change procedures to ensure stronger safeguards are in place to prevent unintended disruptions to processing services.
resolved ·
The issue regarding proofing and syncing slowness has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
investigating ·
We are continuing to monitor the resolution of this issue. We are seeing performance improvements. We will post another update in 1 hour.
monitoring ·
Users may be experiencing an issue with proofing in Da Vinci. A fix for this issue has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 1 hour.
· lasted 4 days
Affected: SalesForce Marketing Cloud
postmortem ·
## Incident Summary Between the hours of 1:00 AM EST on January 20, 2026 and 6:30 AM EST on January 25, 2026, Salesforce Marketing Cloud experienced a service outage. This upstream outage impacted the integration between Da Vinci and Salesforce Marketing Cloud. During this period, customers leveraging SFMC for campaign sending may have experienced intermittent slowness and delayed status updates. Some campaigns remained in "Sending" or "Failed" states and did not transition to "Completed" in the Da Vinci UI even after being successfully sent from SFMC. Salesforce identified a configuration issue on impacted stacks and rolled out a phased fix. Once identified, our team cataloged affected campaigns, validated that the root cause was upstream, and continuously monitored Salesforce's incident updates. We coordinated with CX to support client outreach and provided updates as Salesforce restored service across stacks. ## Resolution After Salesforce resolved the outage, our team confirmed that the Da Vinci and SFMC integration was functioning as expected, verified impacted campaigns, and validated that campaign statuses were correctly reflected in the Da Vinci UI. ## Corrective actions Our monitoring systems successfully detected the outage and will continue to provide alerts to ensure a timely response if a similar issue arises in the future.
resolved ·
Salesforce has completed the rollout of fixes across all impacted stacks, and services have returned to normal operation. We will continue to monitor, but this incident is now considered resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
Customers leveraging SFMC for campaign sending may experience intermittent slowness, or degraded performance. Salesforce has identified a configuration issue on impacted stacks and is rolling out a fix in phases. Our team is continuing to monitor and will provide updates as more information becomes available from Salesforce. Salesforce Statuspage Reference: https://status.salesforce.com/incidents/20003603
· lasted 4h 36m
Affected: Web App
postmortem ·
Summary Between the hours of 1:25AM ET and 11:55AM ET users may have experienced issues with syncing or proofing in Da Vinci. This was caused by one of our email send monitor tasks becoming stuck, which prevented any other ESP sync related tasks from being processed. The issue was escalated to Engineering by Technical Support, and it was resolved shortly after. Resolution At 10:45AM ET the issue with workers being stuck was identified by the Engineering team. More workers were manually provisioned to allow for the ESP sync tasks to resume being processed. Between 10:45AM ET and 11:55AM ET the backlog of queued ESP sync tasks was cleared and service returned to normal. Corrective Actions * An existing mechanism that would have automatically provisioned additional workers and mitigated the issue was found to be non-functional. This mechanism was repaired. * An alert was created to proactively inform engineering if ESP sync tasks are no longer being processed. This will allow for similar failures in the automatic mitigation to be identified quickly.
resolved ·
The issue regarding campaign/creative syncing and proofing has been fully resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
Our team is still monitoring to ensure the issue is fully resolved, and will post another update in 60 minutes.
monitoring ·
We are still monitoring to ensure the issue is fully resolved, and will post another update in 30 minutes.
monitoring ·
A fix for Campaign Syncing & Proofing has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 30 minutes.
monitoring ·
We are continuing to monitor for any further issues.
monitoring ·
A fix for Campaign Syncing & Proofing has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 30 minutes.
investigating ·
Users may be experiencing trouble with proofing/syncing issues in Da Vinci — this is affecting both campaigns and creatives. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
Affected: Dynamic Links
postmortem ·
### Incident Summary Between the hours of 12:51 PM EST and 1:55 PM EST on Monday January 12th, 2026, some Studio customers may have experienced dynamic links routing to fallback destinations. The event was caused by a new configuration of our core router which was not set up correctly for serving dynamic links requests. ### Resolution Once the fallback behavior was reported to Engineering by Technical Support, the Engineers were quickly able to pinpoint the behavior to a deployment from that day. The remedial configuration was first tested in an isolated data center, and after verifying that dynamic links were working again it was deployed to all other datacenters. This restored expected dynamic link behavior. ### Corrective Actions In order to prevent similar issues from occurring in the future: * The change has been committed to source code. * The new deployment architecture will support more dynamic scaling of our core router.
resolved ·
Between 12:51 PM EST and 1:55 PM EST on January 12, 2026, dynamic links in some campaigns were routing to fallback destinations. The issue has been resolved and links are now routing to their expected destinations. If you continue to experience this issue or have additional questions, please reach out to Technical Support. A post-mortem will be published within 7 business days.
· lasted under a minute
postmortem ·
### Incident Summary Between the hours of 3 PM EST on Tuesday January 6th, 2026 and 11 AM EST on Wednesday January 7th, 2026, some data source requests out of the US West datacenter did not utilize the IP addresses on our published allowlist of IP addresses. The event was triggered by the reversion of a service deployment to the US west coast data center in coordination with a new architecture being released. The reverted service also lacked a configured identifier. This resulted in the monitoring service, which is in place to verify that requests egress from the Allow List IP addresses, being rendered ineffective. ### Resolution The new service version was successfully deployed at 11 AM EST on January 7th, 2026. This new version utilizes a new architecture which improves the internal authorization mechanism and included proper configuration to restore normal operation for the Allow List IP address monitoring system. ### Corrective Actions * Implemented an additional alert to identify if the monitoring tool has been disabled * The new architecture has been deployed to more efficiently and accurately support the use of Allowlist IP addresses.
resolved ·
Between the hours of 3 PM EST on Tuesday January 6th, 2026 and 11 AM EST on Wednesday January 7th, 2026, some data source requests out of the US West datacenter did not utilize the IP addresses on our published allowlist of IP addresses. This presented as unauthorized requests to clients using IP allowlisting, and a 403 response code in our platform. This has since been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will follow shortly.
· lasted 40 min
Affected: Active Integrations
postmortem ·
### Incident Summary Between the hours of 6:12PM and 6:51PM ET on Tuesday, January 6th, Studio users may have experienced issues with CSV active integrations \(data sources\). A change was deployed to production intended to improve CSV ingestion performance which inadvertently exposed a previously unidentified permissioning issue in production storage. This caused CSV ingestion failures. Once the change was fully reverted normal CSV processing resumed. No data loss occurred during this time, and no other data ingestion paths were affected. ### Resolution The deployed change introduced new file handling behavior that interacted with production storage permissions in an unexpected way. These permission constraints were not present or enforced in local development environments, preventing detection during pre-deployment testing. Once CSV ingestion errors were detected in production, Engineers were able to trace the issue to storage permission constraints added as a result of the deployment. Once the deployment was reverted to the previous stable version, expected CSV ingestion behavior was immediately restored. ### Corrective Actions In order to prevent similar events from occurring in the future, our Engineering team is working to bring our staging environment to functional parity with production.
resolved ·
The issue regarding CSV Active Integrations has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
investigating ·
Users may be experiencing trouble with the CSV Active Integrations (Data Sources) feature. The issue is presenting itself as failed data updates for existing CSVs Integrations and empty CSV Integrations for net new Active Integrations. Our Engineering team is currently investigating. We will post an update in 24 hours.
· lasted 3 days
Affected: Analytics
postmortem ·
### Incident Summary Between December 19th, 2025 and December 25th, 2025, some users experienced delayed data processing and incomplete reporting. No data was lost. This occurred as the result of a performance degradation in our analytics warehouse that impacted nightly report exports and in-platform analytics availability. The reports resumed as expected once the underlying infrastructure issue was resolved. ### Resolution The root cause of the reporting issue was a prolonged elastic resize operation on the Amazon Redshift production cluster. While the cluster remained technically available during the resize, the operation significantly constrained compute capacity, resulting in degraded query performance and delayed data processing. This impact was not directly visible through our internal telemetry, which delayed identification of the infrastructure resize as the primary cause. Once the elastic resize completed on December 24th, normal warehouse performance was restored. This allowed data ingestion and transformation jobs to process the accumulated backlog, and all reports and analytics were fully completed by December 25th, 04:00 UTC. ### Corrective Actions In order to prevent similar issues from occurring in the future, the Engineering team will: * Improve visibility and alerting around in-progress infrastructure scaling operations * Enhance monitoring to better correlate warehouse performance degradation with infrastructure-level events * Establish clearer operational guidance around expected performance characteristics during future resize operations
resolved ·
The issue regarding delays in Studio reporting has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
We’ve identified the root cause of the issue causing Studio Reporting delays and implemented a fix. We expect data to begin appearing in the platform by the end of the week, with report delivery resuming at that time. We will continue monitoring to ensure the issue is fully resolved, and post another update at time of full reporting functionality returning.
investigating ·
Users may be continuing to experience delays in Studio reporting due to degraded performance in the underlying reporting databases. Our team is actively investigating and is awaiting feedback from the open high-severity ticket with our cloud vendor. We will post another update by 6PM Pacific on Friday, December 26th.
investigating ·
Users may be experiencing delays in Studio reporting due to degraded performance in the underlying reporting databases. Our team is actively investigating and has opened a high-severity ticket with our cloud vendor. We will post another update by 6PM Pacific.
· lasted under a minute
postmortem ·
### Incident Summary Between the hours of 8:48 AM EST on December 8th and 7:14 PM EST on December 11th, users may have received notification emails with an incorrect subject line. The incident was triggered by a code deployment to notification templates. An issue in the updated email templates caused the subject line to reference an incorrect workflow state. While the email body correctly conveyed the intended information, the subject line did not align with the actual campaign status, resulting in conflicting messaging. ### Resolution The issue was reported to Technical Support and escalated to Engineering. Engineers then investigated and traced the root cause to an incorrect subject line reference in the email template. The incident was resolved by updating the affected email template to reference the correct workflow state. After deployment of the fix, all subsequent notification emails were sent with consistent and accurate subject lines that matched the email body and campaign state. ### Corrective Actions In order to prevent similar incidents from occurring in the future, the team has strengthened the change review process for email notification template updates, including requiring mandatory verification of all user-facing copy \(subject lines and email body content\) when creating or modifying notification workflows.
resolved ·
Between the hours of 8:48 AM EST on December 8th and 7:14 PM EST on December 11th, notification center recipients may have received email notifications with an incorrect subject line. The notification was still intentional, and the contents of the email had correct information. This has since been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
Affected: Web App
postmortem ·
### Incident Summary On Tuesday, November 25th, some campaigns were impacted by symptoms like being stuck in the “syncing” or “scheduling” stages. This issue was due to downstream effects from the issue we shared on Friday, November 21st \(posted [here](https://status.movableink.com/incidents/2tgk10mmqv9v)\). ### Resolution The incident was resolved by fixing the resource allocation policies to ensure that each worker had sufficient resources to operate effectively, and will continue to operate smoothly going forward. ### Corrective Actions The Engineering team is auditing the resource allocation policies for all other internal applications to ensure that they will not run into similar issues when scaling.
resolved ·
The issue regarding trouble with campaign syncing, proofing, and recommendations has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
identified ·
A fix for the issues observed with Da Vinci campaign syncing, proofing, and recommendations has been identified. We will continue monitoring to ensure the issue, and post another update in 2 hours.
investigating ·
Users may be experiencing trouble with campaign syncing, proofing, and recommendations. Our Engineering team is currently investigating. We will post an update in 3 hours.
· lasted 1h 58m
Affected: Web App
postmortem ·
### Incident Summary On Friday, November 21st, the Da Vinci Engineering team noticed delayed processing of tasks from one of our background worker pools, and made a change to increase the scaling limits associated with those pools, as well as immediately scaling up resources to clear the backlog and ensure that plenty of workers would be in place for campaign preparation. However, a misconfiguration in the resource allocation policies for that worker pool caused the resources to shrink back to original levels over time instead of remaining at the increased levels, while still keeping the worker count high, leaving insufficient resources to be shared by that number of workers. This also caused downstream issues on Tuesday, November 25th \(incident [here](https://status.movableink.com/incidents/5wcdsk31r261)\), with similar behavior observed of some campaigns being stuck in the “syncing” or “scheduling” stages. ### Resolution The incident was resolved by fixing the resource allocation policies to ensure that each worker had sufficient resources to operate effectively, and will continue to operate smoothly going forward. ### Corrective Actions The Engineering team is auditing the resource allocation policies for all other internal applications to ensure that they will not run into similar issues when scaling.
resolved ·
The issue with campaigns becoming stuck in a stage has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
A fix has been implemented, and campaign transitions should now be functioning as expected. We will continue monitoring to ensure the issue is fully resolved and will share another update within the next hour.
investigating ·
Users may be experiencing trouble with their Da Vinci Campaigns being stuck in various stages. Our Engineering team is currently investigating. We will post an update in 1 hour.
· lasted under a minute
postmortem ·
Incident Summary On Thursday, November 20th, 2025 between 4:15 PM and 4:40 PM EDT, customers may have been shown fallback content from our US West datacenter. Resolution On-call engineers were engaged and after investigation it was determined that the degraded performance window was due to a service rollout which relied on an automatic scaling configuration which was decoupled from the service rollout. This resulted in increased latency to upstream services. Once the issue was identified, the service was immediately scaled out to restore normal operations and the automatic scaling configuration was corrected. Corrective Actions The Engineering team has identified a gap via this scenario and has communicated to relevant groups within Engineering on how to prevent this going forward.
resolved ·
Content rendered in the US West region may have shown fallback content between 4:15 PM and 4:40 PM EST. This was due to a service update. The issue has since been resolved and content is rendering as expected.
· lasted 1h 26m
Affected: Web App
postmortem ·
### Incident Summary Between the hours of 8:56AM EST to 9:25AM EST on November 6th, the Da Vinci web application experienced a brief outage. The event was triggered by a routine deployment conflicting with a processing background task. This task blocked the deployment and prevented us from being able to validate account permissions, which in turn prevented the UI from properly displaying the UI. ### Resolution The processing background task was terminated and deleted, allowing everything to progress as normal. ### Corrective actions The Engineering team identified a gap in proactively monitoring for stuck tasks and has rectified it for the future.
resolved ·
The issue regarding the davinci.movableink.com webpage loading has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
Users might be experiencing trouble loading the davinci.movableink.com webpage. Our Engineering team has identified the cause and deployed a fix. We will continue monitoring to ensure the issue is fully resolved, and post another update in 1 hour.
· lasted 1h 9m
Affected: Web App
postmortem ·
Incident Summary On Wednesday October 29th, 2025 between 4:13 PM and 4:42 PM EDT, [https://app.movableink.com](https://app.movableink.com/) was inaccessible to customers. During a routine upgrade, a previously unmet bug condition in the deployment system was met which resulted in the automatic removal of a network dependency configuration. This caused the dependency to become inaccessible by resources, which resulted in a service disruption for [app.movableink.com](http://app.movableink.com/). Note, this disruption did not have any impact on the content serving path. No campaign traffic or image rendering was affected. Resolution On-call engineers were engaged via automated alerting at 4:13 PM EDT and immediately began to diagnose the situation. At 4:39 PM EDT the issue was identified and a mitigation was put in place to restore [app.movableink.com](http://app.movableink.com/) availability. At 4:42 PM EDT it was confirmed by on-call engineers and automated alerting that service accessibility was restored. Following this, the original network dependency configuration was restored and the temporary mitigation was removed. The team continued to monitor and verified that the issue was fully resolved. Corrective Actions A fix to prevent this condition along with additional, automated, pre-flight guardrails have been identified and will be integrated into the continuous deployment system.
resolved ·
The issue regarding the app.movableink.com webpage loading has been resolved. Please reach out to the Technical Support team if you continue to see this issue or have additional questions. A post-mortem will be posted within 7 business days.
monitoring ·
A fix for the issue loading the app.movableink.com webpage has been identified and pushed. We will continue monitoring to ensure the issue is fully resolved, and post another update in 1 hour.
investigating ·
Users may be experiencing trouble loading the app.movableink.com webpage. Our Engineering team is currently investigating. We will post an update in 1 hour.
The provider writes these records, so a short incident may have been a longer problem for some customers. The longest resolved incident is the figure to plan around if Movable Ink is in a path your customers use; the average is what a normal bad day looks like. Providers keep only recent history, so older incidents may have aged out of their feed rather than never having happened.